Chapter IX Loan Mechanics After Closing
Needs Prior to the First Advance
Needs for all Construction Advances
The Application and Certification for Payment
The Continuation Sheet
The Lien Waiver
The Borrower Affidavit
Inspecting Engineer Report
Reviewing the Requisition
Hard Cost and Soft Cost Advances
Parties with Interests in the Loan
Continuation of Title
Retainage
Materials Stored On and Off Site
Overfunding Vs Underfunding
Keeping the Loan in Balance
The Requisition Cycle-A Continuing One